DESCRIPTION Training Analysis Network Planning With CPM and PERT
The impact of the financial crisis until today still strongly felt by the nation of Indonesia. Various increasingly complex problems on the economy in Indonesia is becoming increasingly unstable. It pushes each company to further increase the potential resources that are owned by the existing technology fitted, so that the company can survive in the competition, both regionally, nationally, and globally.
Companies that can not compete will defeat or decline, even many companies that exist in Indonesia have gone bankrupt. This is because these companies are not able to compete in a variety of ways, which include competing in time and production costs. In relation to the time and cost of production, the company must be efficient in the use of time in a project, it needed a project management.
To assist in planning the project completion can apply analytics Network. In addition, the Network with the Critical Path Method (CPM) and Program Evaluation and Review Technique (PERT) can also be used as a surveillance tool which is good enough for the completion of the project.
CPM is oriented methods that lead to the determination of the time schedule and the estimated time is diterministik / Sure. While PERT is a method that is oriented in the time leading up to the determination of the schedule and the time is probabilistic / possibilities.

OBJECTIVES Training Analysis Network Planning With CPM and PERT
After this training, participants are expected to control the coordination of activities in a job so that the project can be completed within an appropriate period can also help companies to conduct planning and controlling projects with more time and cost efficient.

OUTLINE Training Analysis Network Planning With CPM and PERT
1. The scope of the Project
• Project Management
• Structure Work Solving
• Project Scheduling
• Setup Project
2. Project Management:
• Planning
• Scheduling
• Control
• Decision
3. Critical Path Method Critical-Path Method (CPM)
4. Cost and Time acceleration of project support
5. Analysis of direct and indirect costs
6. Program Evaluation and ReviewTechnique (PERT)

PARTICIPANT Training Analysis Network Planning With CPM and PERT
Participants can be followed by all those interested in this field. It can also be followed by all who want to move on and learn more on this field.

METHOD Training Analysis Network Planning With CPM and PERT
• Presentation
• Discussion among participants
• Case studies
• Simulation
• Evaluation

PELAKSANAAN Training Analysis Network Planning With CPM and PERT
Paket Reguler

  • 25-26 Januari 2018
  • 22-23 Februari 2018
  • 22-23 Maret 2018
  • 12-13 April 2018
  • 24-25 Mei 2018
  • 28-29 Juni 2018

Paket Eksekutif

  • 16-18 Januari 2018
  • 20-22 Februari 2018
  • 20-22 Maret 2018
  • 3-5 April 2018
  • 15-17 Mei 2018
  • 26-28 Juni 2018

INVESTASI Training Analysis Network Planning With CPM and PERT
Paket Reguler : Rp 4.400.000,-/Peserta
Paket Eksekutif : Rp 7.700.000,-/Peserta

Fasilitas Training Analysis Network Planning With CPM and PERT
Paket Reguler : Include PPN, Tas Backpack, Flashdisk, Sertifikat, Lunch, Coffee Break, Training Kit
Paket Eksekutif : Include PPN, Hotel Bintang 4/5, Tas Backpack, Flashdisk, Sertifikat, Lunch, Coffee Break, Training Kit, Antar Jemput, Souvenir